|
Geraldton-Mt Magnet Road (State Route 123) - Former Alignment |
Statistics:
Route Numbering:
General Information:
State Route 123 is a rural highway linking the mining region around Mt Magnet with the ports in Geraldton. At the western end it is a limited access road with reservations for duplication, the remainder of the route is rural highway standard.
History:
This page concentrates on the former alignment between Rangeway and Deepdale.
Geraldton to Mt Magnet | Mt Magnet to Geraldton | |||
Preview: | Description: | Preview: | Description: | |
Utakarra Road: Utakarra Rd (former SR123) at Rangeway, April 2016. Image © Paul Rands |
Advance Directional Sign: AD sign on Horwood Rd (former SR123) approaching Edward Rd at Woorree, April 2016. Image © Paul Rands |
|||
Approaching Abraham Street & Horwood Road: Utakarra Rd (former SR123) approaching Horwood Rd (former SR123) and Abraham St at Utakarra, April 2016. Image © Paul Rands |
Intersection Directional Sign: Poorly amended ID sign assembly at the corner of Horwood Rd (former SR123) and Edward Rd at Worree, April 2016. Image © Paul Rands |
|||
Horwood Road: Horwood Rd (former SR123) at Utakarra just after the former railway level crossing, April 2016. Image © Paul Rands |
||||
Advance Directional Sign: AD sign on Horwood Rd (former SR123) approaching Edward Rd at Woorree, April 2016. Image © Paul Rands |
||||
Edward Road: Corner of Horwood Rd (former SR123) at the junction with Edward Rd at Woorree, April 2016. Image © Paul Rands |
||||
Reassurance Directional Sign: Distance sign with 'To' added to it at on Horwood Rd at Worree, April 2016. Click here for a photo of this location by Terry Siva from July 2014. Image © Paul Rands |
||||
Intersection Directional Signs: ID signs at the corner of Horwood Rd (former SR123) and Masters Rd at Deepdale, April 2016. A small section of Horwood Rd beyond these signs was turned into a no through road when SR123 was re-routed onto its new alignment. Image © Paul Rands |
1 Main Roads Western Australia, List of Controlled Roads
2 Government of Western Australia, Media Statements, Contract let for road safety and design work from Geraldton to Mullewa, 26 March 1996
Last updated: 13-Jan-2019 20:38
This site © Paul Rands. All rights reserved. Some portions © (copyright) by their respective and credited owners. Permission must be obtained before using any images from this site. For details, please email by clicking here.